Workflow run, job, task, and step durations could show **negative**
values (e.g. `-50s`) when `Stopped` was missing, zero (epoch), or
**before** `Started` (clock skew, races, reruns). The UI used
`calculateDuration` with no validation.
This change:
- Uses each row`s **Updated** timestamp as a **fallback end time** when
`Stopped` is invalid but the status is terminal, so duration
approximates elapsed time instead of `0s` or a negative.
- Keeps **`ActionRun.Duration()`** clamped to **≥ 0** when
`PreviousDuration` plus the current segment would still be negative
(legacy bad data).
Fixes#34582.
Co-authored-by: Composer <composer@cursor.com>
Co-authored-by: wxiaoguang <wxiaoguang@gmail.com>
#35783 fixes an actions rerun bug. Due to this bug, some runs may be
incorrectly marked as `StatusWaiting` even though all the jobs are in
done status. These runs cannot be run or cancelled. This PR adds a new
doctor command to fix the inconsistent run status.
```
gitea doctor check --run fix-actions-unfinished-run-status --fix
```
Thanks to @ChristopherHX for the test.
Fix#35781, #27472
The PR will not correct the wrong numbers automatically.
There is a cron task `check_repo_stats` which will be run when Gitea
start or midnight. It will correct the numbers.