Files
gitea/.github/workflows/pull-e2e-tests.yml
T
96b2997c06 ci: use GitHub merge queue (#40130) (#40162)
Backport #40130 by @bircni

Requiring branches to be up to date reruns the full CI matrix on every
waiting PR after each merge, which saturates our 20 concurrent jobs. A
merge queue still tests against the latest `main`, but once per batch.

This runs the PR workflows on `merge_group` and reports `giteabot/lgtm`
on queue commits, since GiteaBot only sets it on PR heads. Mergers queue
PRs with "Merge when ready" instead of `reviewed/wait-merge`, so
giteabot no longer updates branches. Nothing changes until the
`merge-queue` ruleset is enabled and "Require branches to be up to date"
is turned off. Backport to `release/v28` before the ruleset covers it.

Co-authored-by: bircni <bircni@icloud.com>
Co-authored-by: silverwind <me@silverwind.io>
2026-11-01 10:40:02 +00:00

39 lines
987 B
YAML

name: e2e-tests
on:
pull_request:
merge_group:
concurrency:
group: ${{ github.workflow }}-${{ github.head_ref || github.run_id }}
cancel-in-progress: true
permissions:
contents: read
jobs:
files-changed:
uses: ./.github/workflows/files-changed.yml
test-e2e:
if: needs.files-changed.outputs.backend == 'true' || needs.files-changed.outputs.frontend == 'true' || needs.files-changed.outputs.e2e == 'true'
needs: files-changed
runs-on: ubuntu-latest
steps:
- uses: actions/checkout@3d3c42e5aac5ba805825da76410c181273ba90b1 # v7
- uses: ./.github/actions/go-setup
- uses: ./.github/actions/node-setup
- run: make deps-frontend
- run: make frontend
- run: make deps-backend
- run: make backend
env:
TAGS: bindata
- run: make playwright
- run: make test-e2e
timeout-minutes: 10
env:
TAGS: bindata
FORCE_COLOR: 1
GITEA_TEST_E2E_DEBUG: 1